829 Seabury - Move In Checklist

From dtype.org
Revision as of 05:01, 18 April 2017 by Drew (talk | contribs) (pic of family room)

Things to do before mid-May 2017 move in.

Family room floor, pre-buy

Floors

  • Replace carpet in family room with matching hardwood
    • Joe?
  • Replace kitchen linoleum with tile

Inspection Checklist Items

See if Joe wants to own getting this list done? Can break up with plumber, but likely just need someone to knock these out.

Other

  • Replace locks
    • August deadbolts?