829 Seabury - Move In Checklist

From dtype.org
Revision as of 14:40, 26 April 2017 by Drew (talk | contribs)
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Things to do before mid-May 2017 move in.

Family room floor, pre-buy. Carpets to be replaced with hardwood.
Kitchen floor to be replaced with travertine tile.

Floors

  • Replace carpet in family room with matching hardwood. This will make the house 100% matching hardwood floors for non kitchen/bathrooms.
  • Replace kitchen linoleum with tile. Matching now with laundry room and bonus room. (Pic below, comes from Pacifica travertine - Ivoria Premium line.)
Pacifica Ivoria Vein cut 12x24 travertine tile

Inspection Checklist Items

829 Seabury - HomeGuard Inspection List - from report: Home Inspection April 2017

Backyard canopy. Looks great. Just going to check we're at 100%.

Other

  • [INQUIRY] Replace external locks
  • [DONE] Wifi / Cable Hardware
  • [PICKUP AFTER MOVE] Garage shelving, something like Husky 90x90
  • [LATER] Reinforce back vine canopy? Not sure if needed, but while we're in there...
  • Appliances
    • Washer/Dryer
    • Refrigerator
  • Wire house for ethernet. Worth doing anything now while we're rooting around?

Utilities

  • [SCHEDULED] Comcast 2017-05-06 8am service cutover and onsite tech to make sure we have proper line to the junction box
  • Water
  • PG&E
  • [INQUIRY] Garbage
  • [DONE] Mail change of address for 2017-05-06

The Actual Move

  • [CONFIRMED] Moving service - My Dad's Moving, for 2017-05-07
  • [CONFIRMED] Walk through of old place 2017-05-10