829 Seabury - Move In Checklist: Difference between revisions
From dtype.org
(→Other: added org buckets) |
(→Utilities: changed format for mail change of address) |
||
Line 37: | Line 37: | ||
* PG&E | * PG&E | ||
* Garbage | * Garbage | ||
* [ | * [DONE] Mail change of address for 2017-05-06 | ||
== The Actual Move == | == The Actual Move == |
Revision as of 21:31, 25 April 2017
Things to do before mid-May 2017 move in.
Floors
- Replace carpet in family room with matching hardwood. This will make the house 100% matching hardwood floors for non kitchen/bathrooms.
- Joe Ferrante is looking at these on Apr 20.
- Replace kitchen linoleum with tile. Matching now with laundry room and bonus room. (Pic below, comes from Pacifica travertine - Ivoria Premium line.)
Inspection Checklist Items
829 Seabury - HomeGuard Inspection List - from report: Home Inspection April 2017
Other
- [INQUIRY OUT] Replace external locks
- [DONE] Wifi / Cable Hardware
- [PICKUP AFTER MOVE] Garage shelving, something like Husky 90x90
- org buckets for shelves
- [LATER] Reinforce back vine canopy? Not sure if needed, but while we're in there...
- Appliances
- Washer/Dryer
- Refrigerator
Utilities
- [SCHEDULED 2017-05-06] Comcast
- Water
- PG&E
- Garbage
- [DONE] Mail change of address for 2017-05-06
The Actual Move
- [CONFIRMED] Moving service - My Dad's Moving, for 2017-05-07
- [CONFIRMED] Walk through of old place 2017-05-10