829 Seabury - Move In Checklist: Difference between revisions
From dtype.org
No edit summary |
(→Other: ordered wifi items) |
||
Line 24: | Line 24: | ||
* Replace external locks (3?) | * Replace external locks (3?) | ||
* | * Wifi - [ORDERED] | ||
* | ** [http://www.netgear.com/home/products/networking/orbi/ Netgear Orbi] | ||
** [https://www.netgear.com/home/products/networking/cable-modems-routers/CM1000.aspx?cid=wmt_netgear_organic Netgear CM1000] | |||
* Garage shelving, something like [http://www.homedepot.com/p/Husky-90-in-H-x-90-in-W-x-24-in-D-5-Shelf-Welded-Steel-Wire-Deck-Shelving-Unit-in-Black-ERZ902490W-5/206813267 Husky 90x90] | * Garage shelving, something like [http://www.homedepot.com/p/Husky-90-in-H-x-90-in-W-x-24-in-D-5-Shelf-Welded-Steel-Wire-Deck-Shelving-Unit-in-Black-ERZ902490W-5/206813267 Husky 90x90] | ||
* Reinforce back vine canopy? Not sure if needed, but while we're in there... | * Reinforce back vine canopy? Not sure if needed, but while we're in there... |
Revision as of 02:23, 21 April 2017
Things to do before mid-May 2017 move in.
Floors
- Replace carpet in family room with matching hardwood. This will make the house 100% matching hardwood floors for non kitchen/bathrooms.
- Joe Ferrante is looking at these on Apr 20.
- Replace kitchen linoleum with tile
- Not floor, but maybe replace that backsplash of the little bonus counter while we're in there. Can save this for later though.
Inspection Checklist Items
See if Joe wants to own getting this list done? Can break up with plumber, but likely just need someone to knock these out.
- Will get these from the HomeGuard inspection
- rear sliding door
Other
- Replace external locks (3?)
- Wifi - [ORDERED]
- Garage shelving, something like Husky 90x90
- Reinforce back vine canopy? Not sure if needed, but while we're in there...
- Appliances
- Washer/Dryer
- Refrigerator
Utilities
- Comcast
- Water
- PG&E
- Garbage