829 Seabury - Move In Checklist: Difference between revisions
From dtype.org
m (→Utilities: added mail) |
(→Floors) |
||
Line 7: | Line 7: | ||
* Replace carpet in family room with matching hardwood. This will make the house 100% matching hardwood floors for non kitchen/bathrooms. | * Replace carpet in family room with matching hardwood. This will make the house 100% matching hardwood floors for non kitchen/bathrooms. | ||
** [http://www.ferranteconstruction.com Joe Ferrante] | ** [http://www.ferranteconstruction.com Joe Ferrante] is looking at these on Apr 20. | ||
* Replace kitchen linoleum with tile | * Replace kitchen linoleum with tile | ||
** Not floor, but maybe replace that backsplash of the little bonus counter while we're in there. Can save this for later though. | ** Not floor, but maybe replace that backsplash of the little bonus counter while we're in there. Can save this for later though. |
Revision as of 01:25, 19 April 2017
Things to do before mid-May 2017 move in.
Floors
- Replace carpet in family room with matching hardwood. This will make the house 100% matching hardwood floors for non kitchen/bathrooms.
- Joe Ferrante is looking at these on Apr 20.
- Replace kitchen linoleum with tile
- Not floor, but maybe replace that backsplash of the little bonus counter while we're in there. Can save this for later though.
Inspection Checklist Items
See if Joe wants to own getting this list done? Can break up with plumber, but likely just need someone to knock these out.
- Will get these from the HomeGuard inspection
- Home Inspection April 2017
- minor plumbing items
- rear sliding door
Other
- Replace external locks (3?)
- August deadbolts?
- Wifi - Netgear Orbi or Aplifi, probably with a Netgear CM1000
- Garage shelving, something like Husky 90x90
- Reinforce back vine canopy? Not sure if needed, but while we're in there...
- Appliances
- Washer/Dryer
- Refrigerator
Utilities
- Comcast
- Water
- PG&E
- Garbage