829 Seabury - Move In Checklist: Difference between revisions
From dtype.org
(→Inspection Checklist Items: homeguard link) |
(canopy pic) |
||
Line 17: | Line 17: | ||
** [[Media:829-Seabury-Home-Inspection-prebuy2017.pdf|Home Inspection April 2017]] | ** [[Media:829-Seabury-Home-Inspection-prebuy2017.pdf|Home Inspection April 2017]] | ||
* rear sliding door | * rear sliding door | ||
[[File:829seabury-canopy-april2017.jpg|300px|thumb|right|Backyard canopy. Looks great. Just going to check we're at 100%]] | |||
== Other == | == Other == |
Revision as of 06:07, 18 April 2017
Things to do before mid-May 2017 move in.
Floors
- Replace carpet in family room with matching hardwood
- Replace kitchen linoleum with tile
Inspection Checklist Items
See if Joe wants to own getting this list done? Can break up with plumber, but likely just need someone to knock these out.
- sink leak
- Will get these from the HomeGuard inspection
- rear sliding door
Other
- Replace external locks (3?)
- August deadbolts?
- Wifi - Netgear Orbi or Aplifi, probably with a Netgear CM1000
- Garage shelving, something like Husky 90x90
- Reinforce back vine canopy? Not sure if needed, but while we're in there...
- Appliances
- Washer/Dryer
- Refrigerator
Utilities
- Comcast
- Water
- PG&E
- Garbage