829 Seabury - Move In Checklist

From dtype.org
Revision as of 05:44, 18 April 2017 by Drew (talk | contribs) (→‎Inspection Checklist Items: homeguard link)

Things to do before mid-May 2017 move in.

Family room floor, pre-buy. Carpets to be replaced with hardwood.

Floors

  • Replace carpet in family room with matching hardwood
  • Replace kitchen linoleum with tile

Inspection Checklist Items

See if Joe wants to own getting this list done? Can break up with plumber, but likely just need someone to knock these out.

Other

  • Replace external locks (3?)
  • Wifi - Netgear Orbi or Aplifi, probably with a Netgear CM1000
  • Garage shelving, something like Husky 90x90
  • Reinforce back vine canopy? Not sure if needed, but while we're in there...
  • Appliances
    • Washer/Dryer
    • Refrigerator

Utilities

  • Comcast
  • Water
  • PG&E
  • Garbage