829 Seabury - Move In Checklist: Difference between revisions
From dtype.org
(→Other: august link) |
(added wifi) |
||
Line 21: | Line 21: | ||
* Replace locks | * Replace locks | ||
** [http://august.com August] deadbolts? | ** [http://august.com August] deadbolts? | ||
* Wifi | |||
** [http://www.netgear.com/home/products/networking/orbi/ Netgear Orbi] or [https://amplifi.com Aplifi] | |||
== Utilities == | == Utilities == |
Revision as of 05:06, 18 April 2017
Things to do before mid-May 2017 move in.
Floors
- Replace carpet in family room with matching hardwood
- Joe?
- Replace kitchen linoleum with tile
Inspection Checklist Items
See if Joe wants to own getting this list done? Can break up with plumber, but likely just need someone to knock these out.
- sink leak
- Will get these from the HomeGuard inspection
Other
- Replace locks
- August deadbolts?
- Wifi
Utilities
- Comcast
- Water
- PG&E
- Garbage