829 Seabury - Move In Checklist

From dtype.org
Revision as of 04:55, 18 April 2017 by Drew (talk | contribs)

Things to do before mid-May 2017 move in.

Floors

  • Replace carpet in family room with matching hardwood
    • Joe?
  • Replace kitchen linoleum with tile

Inspection Checklist Items

See if Joe wants to own getting this list done? Can break up with plumber, but likely just need someone to knock these out.

Other

  • Replace locks
    • August deadbolts?