829 Seabury - Move In Checklist: Difference between revisions

From dtype.org
(initial page)
(No difference)

Revision as of 04:45, 18 April 2017

Things to do before mid-May 2017 move in.

Floors

  • Replace carpet in family room with matching hardwood
    • Joe?
  • Replace kitchen linoleum with tile

Inspection Checklist Items

See if Joe wants to own getting this list done? Can break up with plumber, but likely just need someone to knock these out.

  • sink leak
  • Will get these from the HomeGuard inspection

Other

  • Replace locks
    • August deadbolts?