Things to do before mid-May 2017 move in.

Family room floor, pre-buy. Carpets to be replaced with hardwood.
Kitchen floor to be replaced with white tile.

Floors

  • Replace carpet in family room with matching hardwood. This will make the house 100% matching hardwood floors for non kitchen/bathrooms.
  • Replace kitchen linoleum with tile. Matching now with laundry room and bonus room. (Pic below, comes from Pacifica travertine - Ivoria Premium line.)
Pacifica Ivoria Vein cut 12x24 travertine tile

Inspection Checklist Items

829 Seabury - HomeGuard Inspection List - from report: Home Inspection April 2017

Backyard canopy. Looks great. Just going to check we're at 100%.

Other

  • [INQUIRY OUT] Replace external locks
  • [DONE] Wifi / Cable Hardware
  • [PICKUP AFTER MOVE] Garage shelving, something like Husky 90x90
  • [LATER] Reinforce back vine canopy? Not sure if needed, but while we're in there...
  • Appliances
    • Washer/Dryer
    • Refrigerator

Utilities

  • [SCHEDULED 2017-05-06] Comcast
  • Water
  • PG&E
  • Garbage
  • [DONE] Mail change of address for 2017-05-06

The Actual Move

  • [CONFIRMED] Moving service - My Dad's Moving, for 2017-05-07
  • [CONFIRMED] Walk through of old place 2017-05-10