829 Seabury - Move In Checklist
From dtype.org
Things to do before mid-May 2017 move in.
Floors
- Replace carpet in family room with matching hardwood. This will make the house 100% matching hardwood floors for non kitchen/bathrooms.
- Joe Ferrante is looking at these on Apr 20.
- Replace kitchen linoleum with tile. Matching now with laundry room and bonus room.
Inspection Checklist Items
See if Joe wants to own getting this list done? Can break up with plumber, but likely just need someone to knock these out.
- Will get these from the HomeGuard inspection
- rear sliding door
Other
- [INQUIRY OUT] Replace external locks
- [ORDERED] Wifi
- [PICKUP AFTER MOVE] Garage shelving, something like Husky 90x90
- [LATER] Reinforce back vine canopy? Not sure if needed, but while we're in there...
- Appliances
- Washer/Dryer
- Refrigerator
Utilities
- Comcast
- Water
- PG&E
- Garbage