829 Seabury - Move In Checklist: Difference between revisions

From dtype.org
(pic of family room)
No edit summary
Line 1: Line 1:
Things to do before mid-May 2017 move in.
Things to do before mid-May 2017 move in.


[[File:829seabury-familyroom-april2017.jpg|300px|thumb|right|Family room floor, pre-buy]]
[[File:829seabury-familyroom-april2017.jpg|300px|thumb|right|Family room floor, pre-buy. Carpets to be replaced with hardwood.]]


== Floors ==
== Floors ==

Revision as of 05:01, 18 April 2017

Things to do before mid-May 2017 move in.

Family room floor, pre-buy. Carpets to be replaced with hardwood.

Floors

  • Replace carpet in family room with matching hardwood
    • Joe?
  • Replace kitchen linoleum with tile

Inspection Checklist Items

See if Joe wants to own getting this list done? Can break up with plumber, but likely just need someone to knock these out.

Other

  • Replace locks
    • August deadbolts?