829 Seabury - Move In Checklist: Difference between revisions
From dtype.org
No edit summary |
(pic of family room) |
||
Line 1: | Line 1: | ||
Things to do before mid-May 2017 move in. | Things to do before mid-May 2017 move in. | ||
[[File:829seabury-familyroom-april2017.jpg|300px|thumb|right|Family room floor, pre-buy]] | |||
== Floors == | == Floors == |
Revision as of 05:01, 18 April 2017
Things to do before mid-May 2017 move in.
Floors
- Replace carpet in family room with matching hardwood
- Joe?
- Replace kitchen linoleum with tile
Inspection Checklist Items
See if Joe wants to own getting this list done? Can break up with plumber, but likely just need someone to knock these out.
- sink leak
- Will get these from the HomeGuard inspection
Other
- Replace locks
- August deadbolts?