829 Seabury - Move In Checklist: Difference between revisions

From dtype.org
Line 20: Line 20:
== Other ==
== Other ==


* [CONFIRMED] Moving service - [http://www.mydadsmoving.com My Dad's Moving], for 2017-05-07
* [INQUIRY OUT] Replace external locks  
* [INQUIRY OUT] Replace external locks  
* [IN HAND] Wifi / Cable Hardware
* [IN HAND] Wifi / Cable Hardware

Revision as of 19:45, 25 April 2017

Things to do before mid-May 2017 move in.

Family room floor, pre-buy. Carpets to be replaced with hardwood.
Kitchen floor to be replaced with white tile.

Floors

  • Replace carpet in family room with matching hardwood. This will make the house 100% matching hardwood floors for non kitchen/bathrooms.
  • Replace kitchen linoleum with tile. Matching now with laundry room and bonus room. (Pic below, comes from Pacifica travertine - Ivoria Premium line.)
Pacifica Ivoria Vein cut 12x24 travertine tile

Inspection Checklist Items

829 Seabury - HomeGuard Inspection List - from report: Home Inspection April 2017

Backyard canopy. Looks great. Just going to check we're at 100%.

Other

  • [INQUIRY OUT] Replace external locks
  • [IN HAND] Wifi / Cable Hardware
  • [PICKUP AFTER MOVE] Garage shelving, something like Husky 90x90
  • [LATER] Reinforce back vine canopy? Not sure if needed, but while we're in there...
  • Appliances
    • Washer/Dryer
    • Refrigerator

Utilities

  • Comcast [SCHEDULED 2017-05-06]
  • Water
  • PG&E
  • Garbage
  • Mail