829 Seabury - Move In Checklist: Difference between revisions
From dtype.org
(→Other: updated statuses) |
(added tile pic) |
||
Line 8: | Line 8: | ||
* Replace carpet in family room with matching hardwood. This will make the house 100% matching hardwood floors for non kitchen/bathrooms. | * Replace carpet in family room with matching hardwood. This will make the house 100% matching hardwood floors for non kitchen/bathrooms. | ||
** [http://www.ferranteconstruction.com Joe Ferrante] is looking at these on Apr 20. | ** [http://www.ferranteconstruction.com Joe Ferrante] is looking at these on Apr 20. | ||
* Replace kitchen linoleum with tile | * Replace kitchen linoleum with tile. Matching now with laundry room and bonus room. | ||
[[File:Ivoria-Vein-cut-12x24-2.jpg|240px|thumb|left|Pacifica Ivoria Vein cut 12x24 travertine tile]] | |||
== Inspection Checklist Items == | == Inspection Checklist Items == |
Revision as of 02:36, 25 April 2017
Things to do before mid-May 2017 move in.
Floors
- Replace carpet in family room with matching hardwood. This will make the house 100% matching hardwood floors for non kitchen/bathrooms.
- Joe Ferrante is looking at these on Apr 20.
- Replace kitchen linoleum with tile. Matching now with laundry room and bonus room.
Inspection Checklist Items
See if Joe wants to own getting this list done? Can break up with plumber, but likely just need someone to knock these out.
- Will get these from the HomeGuard inspection
- rear sliding door
Other
- [INQUIRY OUT] Replace external locks
- [ORDERED] Wifi
- [PICKUP AFTER MOVE] Garage shelving, something like Husky 90x90
- [LATER] Reinforce back vine canopy? Not sure if needed, but while we're in there...
- Appliances
- Washer/Dryer
- Refrigerator
Utilities
- Comcast
- Water
- PG&E
- Garbage